Difference between revisions of "ASAC/SJC/CR12"

From air
Jump to navigation Jump to search
(Created page with "<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >> =Work session 12 : report - 08/02/2018= ===W...")
 
 
Line 4: Line 4:
   
 
===Work session content===
 
===Work session content===
  +
  +
The Material Team went to the Fablab to produce a prototype of the case.
  +
  +
Justin and Corentin continue to adapt the code and obtain several errors.
  +
  +
Charles tries to understand how the LoRa Gateway works and talks to Nicolas Palix: A team of RICM (the computing branch of Polytech Grenoble) work on the gateway and have made advancements so it is useless to focus on it for the moment.
  +
  +
Théo and Nicolas try to send data via LoRaWAN (different from before).

Latest revision as of 19:19, 20 February 2018

<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >>

Work session 12 : report - 08/02/2018

Work session content

The Material Team went to the Fablab to produce a prototype of the case.

Justin and Corentin continue to adapt the code and obtain several errors.

Charles tries to understand how the LoRa Gateway works and talks to Nicolas Palix: A team of RICM (the computing branch of Polytech Grenoble) work on the gateway and have made advancements so it is useless to focus on it for the moment.

Théo and Nicolas try to send data via LoRaWAN (different from before).