Difference between revisions of "ASAC/SJC/CR5"

From air
Jump to navigation Jump to search
 
Line 6: Line 6:
 
*Work on the Thermometer / Moisture meter
 
*Work on the Thermometer / Moisture meter
 
*Work on the main code
 
*Work on the main code
*We continue to work on the previsional schedule
+
*We continue to work on the previsional schedule: [https://air.imag.fr/images/a/ae/Gantt_asac_sjc.pdf#filelinks Download link of previsional schedule]
 
*Translation of the Wiki (from French)
 
*Translation of the Wiki (from French)
 
*Continuous enhancement of the Wiki.
 
*Continuous enhancement of the Wiki.

Latest revision as of 12:22, 14 December 2017

<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >>

Work session 5 : report - 16/11/2017

Work session content

  • Work on the Thermometer / Moisture meter
  • Work on the main code
  • We continue to work on the previsional schedule: Download link of previsional schedule
  • Translation of the Wiki (from French)
  • Continuous enhancement of the Wiki.