Difference between revisions of "ASAC/SJC/CR8"

From air
Jump to navigation Jump to search
(Created page with "<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >> =Work session 8 : report - 07/12/2017= ===Work...")
 
Line 6: Line 6:
 
*Work on the Thermometer / Moisture meter
 
*Work on the Thermometer / Moisture meter
 
*Work on the main code.
 
*Work on the main code.
*First release of our nomenclature (for data sent by LoRa)
+
*First release of our nomenclature (for data sent by LoRa) : [https://air.imag.fr/images/1/16/Nomenclature_EN.pdf#filelinks Download link of the nomenclature]
 
*Talk about the cycle of data's measuring and sending.
 
*Talk about the cycle of data's measuring and sending.

Revision as of 12:24, 14 December 2017

<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >>

Work session 8 : report - 07/12/2017

Work session content

  • Work on the Thermometer / Moisture meter
  • Work on the main code.
  • First release of our nomenclature (for data sent by LoRa) : Download link of the nomenclature
  • Talk about the cycle of data's measuring and sending.