Difference between revisions of "ASAC/SJC/CR9"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
*Work on the main code. |
*Work on the main code. |
||
*Work on our report for next week (semestrial report) and realization of slides. |
*Work on our report for next week (semestrial report) and realization of slides. |
||
− | *Talk with the Water Management project's members about the LoRa nomenclature |
+ | *Talk with the Water Management project's members about the LoRa nomenclature: [[ASAC/Nomenclature_LoRa|LoRa Nomenclature]] |
Latest revision as of 13:03, 14 December 2017
<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >>
Work session 9 : report - 14/12/2017
Work session content
- Work on the Thermometer / Moisture meter
- Work on the main code.
- Work on our report for next week (semestrial report) and realization of slides.
- Talk with the Water Management project's members about the LoRa nomenclature: LoRa Nomenclature