Difference between revisions of "ASAC/SJC/CR9"

From air
Jump to navigation Jump to search
 
Line 7: Line 7:
 
*Work on the main code.
 
*Work on the main code.
 
*Work on our report for next week (semestrial report) and realization of slides.
 
*Work on our report for next week (semestrial report) and realization of slides.
*Talk with the Water Management project's members about the LoRa nomenclature.
+
*Talk with the Water Management project's members about the LoRa nomenclature: [[ASAC/Nomenclature_LoRa|LoRa Nomenclature]]

Latest revision as of 13:03, 14 December 2017

<< Previous Week's Report | Back to Project's Homepage | Next Week's Report >>

Work session 9 : report - 14/12/2017

Work session content

  • Work on the Thermometer / Moisture meter
  • Work on the main code.
  • Work on our report for next week (semestrial report) and realization of slides.
  • Talk with the Water Management project's members about the LoRa nomenclature: LoRa Nomenclature