Difference between revisions of "Proj-2012-2013-trodomètre"

From air
Jump to navigation Jump to search
 
(10 intermediate revisions by the same user not shown)
Line 7: Line 7:
   
 
==Week 2 (01/28)==
 
==Week 2 (01/28)==
  +
*Finishing [http://air.imag.fr/mediawiki/images/0/0a/Report_Trodometre_BJF_TB_PolytechGrenoble.pdf Score Report] and SRS
*Writing Score Report and SRS
 
   
 
==Week 3 (02/04)==
 
==Week 3 (02/04)==
Line 32: Line 32:
 
*Gyroscope and Compas Implementation
 
*Gyroscope and Compas Implementation
 
*Frist Test with InDoorMode
 
*Frist Test with InDoorMode
  +
  +
== Week 9 (04/01) ==
  +
*First Test Analyse
  +
  +
== Week 10 (08/01) ==
  +
*Redefinition of the use of the compass after test
  +
*Tests
  +
*Interface implementation
  +
*Bug correction
  +
*Final Tests and Validation
  +
  +
==Related documents==
  +
*[http://air.imag.fr/mediawiki/images/1/13/KickScooter.tar Code ]
  +
*[http://air.imag.fr/mediawiki/images/5/5b/Trodom%C3%A8tre_report.pdf Report]
  +
*[http://air.imag.fr/mediawiki/index.php/File:Diagramme_de_classe.pdf UML ]
  +
*[http://air.imag.fr/mediawiki/images/7/76/Trodom%C3%A8tre_slides.pdf Slides ]
  +
*[http://air.imag.fr/mediawiki/images/a/a6/Flyer_trodometre.pdf Flyers ]

Latest revision as of 22:50, 24 September 2013

Progress of the project

The project started January 21th, 2013.

Week 1 (01/21)

  • Writing Score Report and SRS

Week 2 (01/28)

Week 3 (02/04)

  • Meeting with tutor and BTLE study

Week 4 (02/11)

  • Set up Class and Activity

Week 5 (02/18)

  • Wahoo Sensor Implementation

Week 6 (03/04)

  • OSM format Study
  • Tutor Edit specifications
  • Update Class Diagram

Week 7 (03/18)

  • GPS Implementation
  • Implementation of Coordinated Calculator
  • Implementation PaserXML OSM (import / export)
  • Frist Test with OutDoorMode(GPS)

Week 8 (03/25)

  • Gyroscope and Compas Implementation
  • Frist Test with InDoorMode

Week 9 (04/01)

  • First Test Analyse

Week 10 (08/01)

  • Redefinition of the use of the compass after test
  • Tests
  • Interface implementation
  • Bug correction
  • Final Tests and Validation

Related documents