Difference between revisions of "Proj-2012-2013-trodomètre"
Jump to navigation
Jump to search
(9 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
==Week 2 (01/28)== |
==Week 2 (01/28)== |
||
− | * |
+ | *Finishing [http://air.imag.fr/mediawiki/images/0/0a/Report_Trodometre_BJF_TB_PolytechGrenoble.pdf Score Report] and SRS |
==Week 3 (02/04)== |
==Week 3 (02/04)== |
||
Line 32: | Line 32: | ||
*Gyroscope and Compas Implementation |
*Gyroscope and Compas Implementation |
||
*Frist Test with InDoorMode |
*Frist Test with InDoorMode |
||
+ | |||
+ | == Week 9 (04/01) == |
||
+ | *First Test Analyse |
||
+ | |||
+ | == Week 10 (08/01) == |
||
+ | *Redefinition of the use of the compass after test |
||
+ | *Tests |
||
+ | *Interface implementation |
||
+ | *Bug correction |
||
+ | *Final Tests and Validation |
||
+ | |||
+ | ==Related documents== |
||
+ | *[http://air.imag.fr/mediawiki/images/1/13/KickScooter.tar Code ] |
||
+ | *[http://air.imag.fr/mediawiki/images/5/5b/Trodom%C3%A8tre_report.pdf Report] |
||
+ | *[http://air.imag.fr/mediawiki/index.php/File:Diagramme_de_classe.pdf UML ] |
||
+ | *[http://air.imag.fr/mediawiki/images/7/76/Trodom%C3%A8tre_slides.pdf Slides ] |
||
+ | *[http://air.imag.fr/mediawiki/images/a/a6/Flyer_trodometre.pdf Flyers ] |
Latest revision as of 21:50, 24 September 2013
Progress of the project
The project started January 21th, 2013.
Week 1 (01/21)
- Writing Score Report and SRS
Week 2 (01/28)
- Finishing Score Report and SRS
Week 3 (02/04)
- Meeting with tutor and BTLE study
Week 4 (02/11)
- Set up Class and Activity
Week 5 (02/18)
- Wahoo Sensor Implementation
Week 6 (03/04)
- OSM format Study
- Tutor Edit specifications
- Update Class Diagram
Week 7 (03/18)
- GPS Implementation
- Implementation of Coordinated Calculator
- Implementation PaserXML OSM (import / export)
- Frist Test with OutDoorMode(GPS)
Week 8 (03/25)
- Gyroscope and Compas Implementation
- Frist Test with InDoorMode
Week 9 (04/01)
- First Test Analyse
Week 10 (08/01)
- Redefinition of the use of the compass after test
- Tests
- Interface implementation
- Bug correction
- Final Tests and Validation