=User stories=
 
=User stories=
 
 
 
1. The RICM want the car works in order to start the project.
1. The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm).
 
   
 
2. The developer have to optimize the processing speed to provide a better product experience.
 
2. The developer have to optimize the processing speed to provide a better product experience.
Line 11: Line 11:
 
5. The researcher must be able to consult in real time the car's information to make changes if needed.
 
5. The researcher must be able to consult in real time the car's information to make changes if needed.
   
 
6. The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm).<br>
6. The RICM want the car works in order to start the project.<br>
 
   
 
=Product backlog=
 
=Product backlog=
Line 61: Line 61:
   
 
=Sprint 1=
 
=Sprint 1=
We need to do the tasks 1, 3 and 5
+
We need to do the tasks 2, 5 and 6
   
 
=End Sprint 1=
 
=End Sprint 1=
Line 71: Line 71:
   
 
The frame rate is very slow. The car is moving slowly.
 
The frame rate is very slow. The car is moving slowly.
  +
  +
=Sprint 2=
  +
We need to do the tasks 1, 3 and 5
  +
   
 
=Waffle=
 
=Waffle=

Revision as of 19:33, 8 March 2015

User stories

1. The RICM want the car works in order to start the project.

2. The developer have to optimize the processing speed to provide a better product experience.

3. The researcher must be able to change the vehicle mode to realize different tests.

4. The RICM must master the different technologies to be able to do the project.

5. The researcher must be able to consult in real time the car's information to make changes if needed.

6. The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm).

Product backlog

User story Priority Time Actors
1 The RICM want the car works in order to start the project. ( 6 ) 34 1 week
2 The RICM must master the different technologies to be able to do the project. ( 4 ) 34 all time all
3 The researcher must be able to consult in real time the car's information to make changes if needed. ( 5 ) 21 2 weeks
4 The developer have to optimize the processing speed to provide a better product experience. ( 2 ) 21 1 week
5 The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm). ( 1 ) 13
6 The researcher must be able to change the vehicle mode to realize different tests. ( 3 ) 8 3 weeks

Sprint 1

We need to do the tasks 2, 5 and 6

End Sprint 1

Tasks done : 1 and 3

Problems : Task 5 : problem with the speed of processing the images.

The frame rate is very slow. The car is moving slowly.

Sprint 2

We need to do the tasks 1, 3 and 5