Project 2014-2015-CannonBall/Scrum

From air
Jump to navigation Jump to search

User stories

1. The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm).

2. The developer have to optimize the processing speed to provide a better product experience.

3. The researcher must be able to change the vehicle mode to realize different tests.

4. The RICM must master the different technologies to be able to do the project.

5. The researcher must be able to consult in real time the car's information to make changes if needed.

6. The RICM want the car works in order to start the project.

Product backlog

User story Priority Time Actors
The RICM want the car works in order to start the project. ( 6 ) 34 1 week
The RICM must master the different technologies to be able to do the project. ( 4 ) 34 all time all
The researcher must be able to consult in real time the car's information to make changes if needed. ( 5 ) 21 2 weeks
The developer have to optimize the processing speed to provide a better product experience. ( 2 ) 21 1 week
The researcher must be able to send a line of instruction for verify the good behavior of the car (Control Algorithm). ( 1 ) 13
The researcher must be able to change the vehicle mode to realize different tests. ( 3 ) 8 3 weeks

Sprint 1

We need to do the tasks 2, 5 and 6

End Sprint 1

Tasks done : 6 and 5

Problems : Task 2 : problem with the speed of processing the images.

The frame rate is very slow. The car is moving slowly.

Sprint 2

We need to do the tasks 1, 3 and 5.

We add also the task 2 because this one was not finished in the last sprint.

Task 3 is already working, so we add some changes on this task : The developper can add specific orders to the car with the help of qrCode to realize different tests.

Waffle