Subject: Sonotone

Supervisors:

  • Jérôme Maisonasse

Students:

  • HATTINGUAIS Julian (RICM4)
  • LECORPS Germain (RICM4)
  • VOUTAT Manuel (RICM4)


Subject summary

Week 1 (January 18th - January 24th)

Objectives

Documentation on sonotone (learning process)
Study of software already used for hearing aid (learning process)
Learning of a new programmation language : python with NUMPY and SCYPI modules

Work done

Assembling the needed documentation
A few prototypes and little program on Fourier transform and signal edition

Problems faced

Difficulties to apply a filter to an audio signal in python

Week 2 (January 25th - January 31th)

Objectives

Prototype of an equalizer filter (3 weeks job)
Learning of new concepts in Signal Processing

Work done

More prototypes about filters and signals edition
Learning of the concepts we need for peacking filter and z-transform

Problems faced

Difficulties to apply our theoritical knowledge of a numerical processing

Week 3 (February 1st - February 7th)

Objectives

Prototype of an equalizer filter (3 weeks job)
Apply a gain on a specific frequency (by peaking filter)

Work done

prototype of a peaking filter which works and which is performant

Problems faced

Difficulties to apply the gain the correct frequency

Week 4 (February 8th - February 14th)

Objectives

Prototype of an equalizer filter (3 weeks job)
Graphic equalizer

Work done

Graphic equalizer done!

Graphic Equalizer

Problems faced

None

Week 5 (February 15th - February 21st)

Objectives

Prototype of a parametric equalizer

Work done

We replaced peaking filters with shelf filters to improve the quality of the signal processing

Problems faced

Applying mutliple filters on one signal leads to several bugs and is less effective than shelf filters

Week 6 (February 29th - March 6th)

Objectives

Filtering in real time

Work done

Capture of the sound from a microphone and digitizing that sound via a C module.

Problems faced

Convert data from the C module to python data we can use in the equalizer.

Week 7 (March 7th - March 13th)

Objectives

Filtrage en temps réel

Work done

Problems faced

Week 8 (March 14th - March 20th)

Objectives

Filtrage en temps réel

Work done

Problems faced

Week 9 (March 21st - March 27th)

Objectives

Filtrage en temps réel/GUI (Design, IHM…)

Work done

Problems faced

Week 10 (March 28th - April 3rd)

Objectives

GUI (Design, IHM…)

Work done

Problems faced