Projets-2016-2017-Serres connectées

From air
Jump to navigation Jump to search

Project presentation

Sky view of the exploitation (© Google Maps)

The project subject : Serres connectées.

The project consist of upgrading a classic greenhouse to retrieve live information about its climate. The farm exploitation is located in Saint-Cassien (38500), in the French Alps.

Data to retrieve :

  • Air temperature
  • Air moisture
  • Soil moisture

Control of these parameters are essentials to avoid disease, enhance the growth of the plantations and limit water consumption.

Two main constrains :

  • No power in the zone
  • Sensors needs to be moveable to let vehicles move along the greenhouse



Team

  • Supervisor: Nicolas Palix and Vincent Hibon

Documents

Calendar

The project started on January 9th, 2017.

Week 1 (January 9th - January 15th)

Week 2 (January 16th - January 22th)

  • Introduction to LoRa by Didier Donsez.
  • Discovery of the project
  • Setup of our computers to be able to program our Adafruit Feather.
  • First Hello world with the hardware (Discussion between two Adafruit Feather 32u4 in LoRa)
  • Call with one of the managers of the farm, Vincent, the feeling is good with him, we spoke during one hour :
    • He spoke about him and his wife farm exploitation
    • He detailed the farm layout
    • We asked him some precise questions about the project (Types and numbers of sensors wanted, data wanted, ...)
    • We agree on a meeting for the next Wednesday (25/01/2017)

Week 3 (January 23th - January 29th)

  • Define the use case diagram
  • Taking charge of the Adafruit Feather card and the PyCom one.
  • We wrote a little program that is able to send and receive data. At the moment these data are fake temperature until we embedded real sensors
  • We determinate the length maximum of data that we can sent to be able to record data each 30 minutes and respect the duty cycle (1% of the time)
  • The meeting was canceled by the managers of the farm and reported to the 8th of February

Week 4 (January 30th - February 5th)

  • Call with Vincent Hibon on the 1st of Feb. We spoke about the advancement of the project (more details will come).

Materials

Thermometer, barometer, moisture sensor
Pycom
Pycom_Lo
Electronic test plate
Solar panel
Waterproof case