RICM4 2017 2018 -SeriousGame Polystar

From air
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Project presentation

This project (2017-18 version of [1]) consists of :

  • The implementation of the game described here [2]
  • The deployment of the application on tactile tables.


Equipment

  • 2 Tactile tables Tactualities

Team

Members : Tim LEPAGE, Dimitri SERGEANT - RICM4 @ Polytech Grenoble (UGA)

Supervisor : Didier Donsez Anne Laure Finkel Stéphanie Diligent

Deliverables

Progress

Week 1 (15-21 jan)

Subjects were assigned.

Researches on the technologies that could be used.

Week 2 (22-28 jan)

Installed Meteor and followed tutorials to learn how to use the technology.

Started to open the tactile tables to see how it works.

Week 3 (29 jan - 4 feb)

We made the tables work.

Meeting with A-L Finckel :

  • Explications about the game
  • Definition of the essentials of the game

Meeting with D. Donsez :

  • Explained current advancement.

Started application development

Week 4 (5-11 feb)

Brainstorming :

  • How do we both see the game (interface, different game sequences)
  • Distribution of the tasks

Started to fill the SRS.


Week 5 (12-18 feb)

Application development :

  • Organisation of the different webpages of the application (home, gamepage, authentification page, modification page)
  • Started to gather informations about collection : (used to save the Units and the Cards of the game)

Kept filling SRS and started filling UML.

Week 6 (19-24 feb) Hollidays

Filled SRS and UML.

Application development :

  • Started the authentification system based on meteor accounts

Week 7 (26 feb - 04 mar)

Application development :

  • Started CSS implementation + Screen rotation
  • Timer implementation
  • Number of teams and units selected linked dynamically with the game

Meeting with D. Donsez :

  • Explained current advancement.
  • Questions about technical difficulties (CSS with meteor, sendMail)

Week 8 (05-11 mar)

Application development :

  • Creation of the cards and units collection
  • Options implemented : add / modify / delete cards from the collection (linked with the units)
  • CSS
  • Started the game loop

Week 9 (12-18 mar)

Half way project presentation

  • Creation of the ppw + meeting with teachers

RICM 16 years anniversary

  • Poster creation

Application development :

  • Implemented a basic system of points and win conditions

Week 10 (19-25 mar)

Application development :

  • The game is now fully operational. We are adding animations and graphic corrections.
  • Bug correction.

Week 11 (26 mar - 01 apr)

  • Tested the game on the tables
  • Try to find a way to deploy the application so it can work on many tables and not only in localhost