Difference between revisions of "RICM4 2017 2018 - IGreenHouse"

From air
Jump to navigation Jump to search
Line 4: Line 4:
 
== Week 1 - Jan 22 ==
 
== Week 1 - Jan 22 ==
   
découverte des technos (node-js, MQTT, InfluxDB, Docker, Node-RED, Grafana)
+
discovery of the technos (node-js, MQTT, InfluxDB, Docker, Node-RED, Grafana)
   
 
== Week 2 - Jan 28 ==
 
== Week 2 - Jan 28 ==
   
Aurélien : Mise en place du Docker
+
Aurélien : Docker
   
Thomas, Joffrey : Mise en place du ping pong entre 2 cartes LoRa, testing Arduino LoRa
+
Thomas, Joffrey : ping pong between 2 LoRa, testing Arduino LoRa
   
  +
Thomas : Test on cards
Thomas : Mesure de température avec la carte LoRa, connectivité entre les cartes
 
   
Joffrey : Utilisation de node-RED
+
Joffrey : Installed and tested node-red
   
 
'''Unable to make Pico GW working on two personal computers running Linux (unable to perform com stress test : unable to connect to board)'''
 
'''Unable to make Pico GW working on two personal computers running Linux (unable to perform com stress test : unable to connect to board)'''
   
 
== Week 3 - Feb 5 ==
 
== Week 3 - Feb 5 ==
  +
''TODO : test GW on another PC, otherwise add verbosity to source (DEBUG_MSG)''
 
  +
Gateway is quite fonnctionning (done with 2 other groups)
  +
  +
== Week 4 - Feb 12 ==
  +
  +
Thomas : Link between influxDB and grafana
  +
  +
Joffrey : Link between MQTT output on user decide to influxDB (waiting for the protocole to do the function to transform data send into influxDB data)
  +
  +
Aurélien : Working with the other group on gateway->MQTT part
   
 
= Ideas bucket =
 
= Ideas bucket =

Revision as of 19:14, 13 February 2018

Presentation

Progress

Week 1 - Jan 22

discovery of the technos (node-js, MQTT, InfluxDB, Docker, Node-RED, Grafana)

Week 2 - Jan 28

Aurélien : Docker

Thomas, Joffrey : ping pong between 2 LoRa, testing Arduino LoRa

Thomas : Test on cards

Joffrey : Installed and tested node-red

Unable to make Pico GW working on two personal computers running Linux (unable to perform com stress test : unable to connect to board)

Week 3 - Feb 5

Gateway is quite fonnctionning (done with 2 other groups)

Week 4 - Feb 12

Thomas : Link between influxDB and grafana

Joffrey : Link between MQTT output on user decide to influxDB (waiting for the protocole to do the function to transform data send into influxDB data)

Aurélien : Working with the other group on gateway->MQTT part

Ideas bucket