Difference between revisions of "RICM4 2017 2018 - Serre Connectee"

From air
Jump to navigation Jump to search
Line 43: Line 43:
 
* Git repository opened
 
* Git repository opened
   
  +
== Week 2 - 29/01/2018 ==
{|style="margin: 0 auto;"
 
  +
* Contacting the IESE group
| [[File:I-greenhouse-components.jpg |thumb|upright|alt = Sensors |Thermometer, barometer, moisture sensor]]
 
  +
* More in depth understanding of the project objectives
| [[File:Nucleo_LR073RZ_with_SX1272_Shield.jpg|thumb|upright|alt = Nucleo Card|Nucleo LR073RZ with SX1272 LoRa shield]]
 
| [[File:pycom.jpg |thumb|upright|alt = Pycom |Pycom]]
 
| [[File:pycom_Lo.jpg |thumb|upright|alt = Pycom_Lo |Pycom_Lo]]
 
| [[File: electronic_Test_plate.jpg |thumb|upright|alt = Electronic test plate | Electronic test plate ]]
 
| [[File: solar_pannel.jpg |thumb|upright|alt = Solar panel | Solar panel ]]
 
| [[File: waterproof_case_.jpg |thumb|upright|alt = Waterproof case| Waterproof case ]]
 
|}
 

Revision as of 11:34, 5 February 2018

Project presentation

Sky view of the exploitation (© Google Maps)

The project subject : Serres connectées.

The project consist of upgrading a classic greenhouse to retrieve live information about its climate. The farm exploitation is located in Saint-Cassien (38500), in the French Alps.

Data to retrieve :

  • Air temperature
  • Air moisture
  • Soil moisture

Control of these parameters are essentials to avoid disease, enhance the growth of the plantations and limit water consumption.

Two main constrains :

  • No power in the zone
  • Sensors needs to be moveable to let vehicles move along the greenhouse

(Presentation from last year)

Team

  • Supervisor: Nicolas Palix
  • Members: Guillaume.Besnard Timothée.Depriester

Calendar

The project started on January 22th, 2018

Week 1 - 22/01/2018

  • Getting to know the nucleo card :
    • We tried online mbed compilation tools
    • We manage to cross-compile locally on Arch Linux and deploy on the card
    • We transmitted data betwteen two LoRa card using peer to peer
    • Using the Lora module OVER the nucleo extension card is not currently working.
  • Zenkit agenda created
  • Git repository opened

Week 2 - 29/01/2018

  • Contacting the IESE group
  • More in depth understanding of the project objectives