Difference between revisions of "RICM4 2017 2018 - robair2"

From air
Jump to navigation Jump to search
Line 1: Line 1:
  +
=='''Progress'''==
* Semaine 1
 
  +
Présentation et découverte du matériel et réflexion sur le cahier des charges.
 
* Semaine 2
+
==Semaine 1==
  +
Presentation of the hardware and brainstorming. Establishment of the specification.
Installation du logiciel et réglage des problèmes de version.
 
 
==Semaine 2==
  +
Installation of RobAIR software and fixing version issues.
  +
==Semaine 3==
  +
Study of interface implemenation and addition of a button on the client interface.

Revision as of 13:50, 12 February 2018

Progress

Semaine 1

Presentation of the hardware and brainstorming. Establishment of the specification.

Semaine 2

Installation of RobAIR software and fixing version issues.

Semaine 3

Study of interface implemenation and addition of a button on the client interface.