Proj-2012-2013-BuildingManagementSystem: Difference between revisions

From air
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
We are 3 RICM4 students from [[Polytech Grenoble]]: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from [ENSAG]: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs.
We are 3 RICM4 students from [[Polytech Grenoble]]: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from [[ENSAG]]: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs.


==Objective==
==Objective==


The objective of this project is to design and prototype a subsystem of temperature control and air quality ([HVAC])of a building management system.
The objective of this project is to design and prototype a subsystem of temperature control and air quality ([[HVAC]])of a building management system.


==Progress==
==Progress==

Revision as of 21:46, 21 January 2013

We are 3 RICM4 students from Polytech Grenoble: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from ENSAG: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs.

Objective

The objective of this project is to design and prototype a subsystem of temperature control and air quality (HVAC)of a building management system.

Progress

Week 1 : 2013/01/14 - 2013/01/20

  • Choice of the subject.
  • Group formation.
  • Scientific monitoring.

Week 2 : 2013/01/21 - 2013/01/27

  • Familiarization with Arduino
  • Writing of the Software Requirements Specification (SRS)

(Write the SRS)