Proj-2013-2014-flying-3Dscan: Difference between revisions

From air
Jump to navigation Jump to search
No edit summary
No edit summary
Line 29: Line 29:


=Introduction=
=Introduction=
==Generate a 3-dimensional model of a building by automatically taking 2-dimensional photos around this building through a camera integrated in a programmed smartphone installed on a drone.==
Generate a 3-dimensional model of a building by automatically taking 2-dimensional photos around this building through a camera integrated in a programmed smartphone installed on a drone.


= Team =
= Team =

Revision as of 15:35, 27 January 2014

The document provides a template of the Software Requirements Specification (SRS). It is inspired of the IEEE/ANSI 830-1998 Standard.


Read first:


Document History
Version Date Authors Description Validator Validation Date
0.1.0 TBC TBC TBC TBC TBC


Introduction

Generate a 3-dimensional model of a building by automatically taking 2-dimensional photos around this building through a camera integrated in a programmed smartphone installed on a drone.

Team

  • Tutors : Didier Donsez
  • Members : GUO Kai , SUN Xuan , ZHANG Zhengmeng

General description

..

..

Specific requirements, covering functional, non-functional and interface requirements

  • document external interfaces,
  • describe system functionality and performance
  • specify logical database requirements,
  • design constraints,
  • emergent system properties and quality characteristics.

Requirement X.Y.Z (in Structured Natural Language)

Function:

Description:

Inputs:

Source:

Outputs:

Destination:

Action:

  • Natural language sentences (with MUST, MAY, SHALL)
  • Graphical Notations : UML Sequence w/o collaboration diagrams, Process maps, Task Analysis (HTA, CTT)
  • Mathematical Notations
  • Tabular notations for several (condition --> action) tuples

Non functional requirements:

Pre-condition:

Post-condition:

Side-effects:

Product evolution

Progress

Week 0 (Jan 13th - Jan 19th)

Week 1 (Jan 20th - Jan 26th)

Week 2 (Jan 27th - Feb 2nd)

Appendices

Index