RICM4 2017 2018 - robair2: Difference between revisions

From air
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
=='''Progress'''==
* Semaine 1

Présentation et découverte du matériel et réflexion sur le cahier des charges.
* Semaine 2
==Semaine 1==
Presentation of the hardware and brainstorming. Establishment of the specification.
Installation du logiciel et réglage des problèmes de version.
==Semaine 2==
Installation of RobAIR software and fixing version issues.
==Semaine 3==
Study of interface implemenation and addition of a button on the client interface.

Revision as of 11:50, 12 February 2018

Progress

Semaine 1

Presentation of the hardware and brainstorming. Establishment of the specification.

Semaine 2

Installation of RobAIR software and fixing version issues.

Semaine 3

Study of interface implemenation and addition of a button on the client interface.