RICM4 2017 2018 - Serre Connectee: Difference between revisions

From air
Jump to navigation Jump to search
Line 52: Line 52:


== Week 3 - 05/02/2018 ==
== Week 3 - 05/02/2018 ==
* Git Repository creation
* Testing Pico Lora Gateway
* Testing Pico Lora Gateway
** Flashed the gateway (the software was outdated, leading to an error)
** Flashed the gateway (the software was outdated, leading to an error)
Line 58: Line 59:
** Forwarging the packet with the picoGW_packet_forwarder
** Forwarging the packet with the picoGW_packet_forwarder
** Successfully retrieved a "Ping" (conversion base64 to ASCII)
** Successfully retrieved a "Ping" (conversion base64 to ASCII)
* Git Repository creation

Revision as of 16:12, 5 February 2018

Project presentation

Sky view of the exploitation (© Google Maps)

The project subject : Serres connectées.

The project consist of upgrading a classic greenhouse to retrieve live information about its climate. The farm exploitation is located in Saint-Cassien (38500), in the French Alps.

Data to retrieve :

  • Air temperature
  • Air moisture
  • Soil moisture

Control of these parameters are essentials to avoid disease, enhance the growth of the plantations and limit water consumption.

Two main constrains :

  • No power in the zone
  • Sensors needs to be moveable to let vehicles move along the greenhouse

(Presentation from last year)

Team

  • Supervisor: Nicolas Palix
  • Members: Guillaume.Besnard Timothée.Depriester

Calendar

The project started on January 22th, 2018

Week 1 - 22/01/2018

  • Getting to know the nucleo card :
    • We tried online mbed compilation tools
    • We manage to cross-compile locally on Arch Linux and deploy on the card
    • We transmitted data betwteen two LoRa card using peer to peer
    • Using the Lora module OVER the nucleo extension card is not currently working.
  • Zenkit agenda created
  • Git repository opened

Week 2 - 29/01/2018

  • Contacting the IESE group
  • More in depth understanding of the project objectives
  • Begin the docker documentation reading
  • Store and display data specification
    • InfluxDB
    • Graphana

Week 3 - 05/02/2018

  • Git Repository creation
  • Testing Pico Lora Gateway
    • Flashed the gateway (the software was outdated, leading to an error)
    • Configuration tuning to match the "Ping Pong" test software.
    • Testing the gateway with the logger utility
    • Forwarging the packet with the picoGW_packet_forwarder
    • Successfully retrieved a "Ping" (conversion base64 to ASCII)