Scrum - Gestionnaire de packages: Difference between revisions
Jump to navigation
Jump to search
Regis.Ramel (talk | contribs) |
Regis.Ramel (talk | contribs) |
||
| Line 10: | Line 10: | ||
= Sprints Scrum = |
= Sprints Scrum = |
||
== Sprint |
== 1er Sprint : 23/01 - 05/02 == |
||
=== Objectif initial : === |
=== Objectif initial : === |
||
* Étudier la faisabilité du projet |
* Étudier la faisabilité du projet |
||
| Line 21: | Line 21: | ||
=== Revue de sprint : === |
=== Revue de sprint : === |
||
== |
== 2eme Sprint : 06/01 - 19/02 == |
||
=== Objectif initial : === |
=== Objectif initial : === |
||
| Line 31: | Line 31: | ||
== |
== 3eme Sprint : 20/02 - 05/03 == |
||
=== Objectif initial : === |
=== Objectif initial : === |
||
| Line 41: | Line 41: | ||
== |
== 4eme Sprint : 06/02 - 17/03 == |
||
=== Objectif initial : === |
|||
=== Réalisation : === |
|||
=== Revue de sprint : === |
|||
== 4eme Sprint : 13/03 - 17/03 == |
|||
=== Objectif initial : === |
=== Objectif initial : === |
||
Revision as of 08:15, 30 January 2017
Voici la Fiche de sprint Scrum du Projet 2017 : Gestionnaire de package.
Équipe
- Rémi Gattaz
- Germain Lecorps (Chef de Projet)
- Thibaut Nouguier
- Régis Ramel (Scrum Master)
Sprints Scrum
1er Sprint : 23/01 - 05/02
Objectif initial :
- Étudier la faisabilité du projet
- Rencontrer des enseignants compétents dans la gestion de packages debian
- Commencer à se documenter et à étudier des solutions pour la réalisation du projet
Réalisation :
- Design de la structure de l'application