Difference between revisions of "Fiche - Tachymètre"

From air
Jump to navigation Jump to search
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Equipe projet =
+
= Project team =
 
* MACE Quentin
 
* MACE Quentin
 
* NOUGUIER Thibaut
 
* NOUGUIER Thibaut
Line 5: Line 5:
 
* Tuteur : Olivier Gattaz
 
* Tuteur : Olivier Gattaz
   
= Avancement du projet =
+
= Project progress =
== Semaine 1 : 11 Janvier - 17 Janvier ==
+
== Week 1 : 11/01 - 17/01 ==
  +
Work done :
* Choix du projet
 
  +
* Choice of the project
* Présentation de Cohorte par Oliver Gattaz et Bassem Debbabi
 
  +
* Presentation of Cohorte by Olivier Gattaz and Bassem Debbabi
   
== Semaine 2 : 18 Janvier - 24 Janvier ==
+
== Week 2 : 18/01 - 24/01 ==
  +
Work done :
* Découverte du projet
 
  +
* Discover of the project environment
* Installation de Cohorte
 
  +
* Installation of Cohorte tools
* Détermination des exigences fonctionnelles et non fonctionnelles
 
  +
* Definition of functional and non-functional requirements
* [[SRS_-_Tachymètre | '''SRS''']]
 
  +
* Writing of the SRS
   
== Semaine 3 : 25 Janvier - 31 Janvier ==
+
== Week 3 : 25/01 - 31/01 ==
  +
Work done :
* Tutoriel Cohorte réalisé
 
  +
* Cohorte tutorial done
* [[UML_-_Tachymètre | '''UML''']]
 
  +
* Realisation of UML diagrams
   
== Semaine 4 : 1 Février - 7 Février ==
+
== Week 4 : 01/02 - 07/02 ==
  +
Work done :
* Rendez-vous à Isandlatech avec Olivier Gattaz
 
  +
* Meeting at Isandlatech with Olivier Gattaz
* Etude de l'effet Doppler
 
  +
* Study of the Doppler effect
* Simulation de calcul de vitesse à partir d'un angle et d'une fréquence
 
  +
* Simulations of speed calculations based on the frequency
* Début du projet avec Cohorte
 
  +
* Starting the project with Cohorte
   
== Semaine 5 : 8 Février - 14 Février ==
+
== Week 5 : 08/02 - 14/02 ==
  +
Work done :
* Rendez-vous à Isandlatech avec Olivier Gattaz
 
  +
* Meeting at Isandlatech with Olivier Gattaz
* Travail sur le diagramme composant
 
  +
* Working on the component diagram
* Travail sur la structure du client web
 
  +
* Working on the web client’s structure
* Discussion sur les données élaborées et synthétiques
 
  +
* Definition of processed data and synthetic data
* Répartition des tâches et estimation des temps de travail
 
  +
* Tasks repartition
* Travail sur les cas d'utilisation
 
  +
* Working on use case
   
== Semaine 6 : 15 Février - 21 Février ==
+
== Week 6 : 15/02 - 21/02 ==
  +
Work done :
* Rendez-vous à Isandlatech avec Olivier Gattaz
 
  +
* Meeting at Isandlatech with Olivier Gattaz
* Travail sur Cohorte : Spécification des composants et de la structure de l'application
 
  +
* Working on Cohorte : Specification of components an application’s structure
* Travail sur la connexion au Raspberry Pi (nombreux échecs)
 
  +
* Working on wiring the sensor
* Travail sur le cablage du capteur
 
  +
* Working on connecting the Raspberry Pi (many fails)
  +
Problems :
  +
* Confusion between our Raspberry and Isandlatech’s
  +
* SD carte troubleshooting, impossible to install raspbian
   
== Semaine 7 : 22 Février - 28 Février ==
+
== Week 7 : 22/02 - 28/02 ==
  +
Work done :
* Vacances
 
  +
* Holidays
* Tentative d'installation de raspbian sur le Raspberry (échec)
 
  +
* Tries to install raspbian on the Raspberry (fail)
   
== Semaine 8 : 29 Février - 6 Mars ==
+
== Week 8 : 29/02 - 06/03 ==
  +
Work done :
* Installation de raspbian sur le Raspberry
 
  +
* Installation of raspbian on the Raspberry
* Travail sur la présentation du 7 mars
 
  +
* Working on the 7th march presentation
  +
Problems :
  +
* An Arduino is needed to acquire measures from the HB100
   
== Semaine 9 : 7 Mars - 13 Mars ==
+
== Week 9 : 07/03 - 13/03 ==
  +
Work done :
* Soutenance de milieu de projet
 
  +
* 7th march presentation
* Travail sur l'interface web
 
  +
* Working on the web interface
* Rendez-vous à Isandlatech avec Olivier Gattaz
 
  +
* Meeting at Isandlatech with Olivier Gattaz
* Travail sur la connexion Raspberry Pi - Arduino
 
  +
* Working on the connection Raspberry – Arduino
* Travail sur la connexion Arduino - HB100
 
* Établissement de la connexion entre l'Arduino et un PC
+
* Working on the connection Arduino HB100
  +
* Connexion between Arduino and a PC established
* Travail sur le renvoi et l'affichage des valeurs captées par le HB100
 
  +
* Working on returning and displaying measures from the sensor
== Semaine 10 : 14 Mars - 20 Mars ==
 
  +
* Travail sur la transmission des données de l'Arduino au Raspberry
 
  +
== Week 10 : 14/03 - 20/03 ==
* Travail sur l'élaborateur des données
 
  +
Work done :
* Travail sur le client web
 
  +
* Working on the transmission of data between the Arduino and the Raspberry
* Travail sur les composants du Raspberry (cache, sender)
 
  +
* Working on the data process
* Rendez-vous à Isandlatech avec Olivier Gattaz
 
  +
* Working on the web interface
* Test en voiture autour de Isandlatech
 
  +
* Working on the Raspberry components
* Atelier bricolage pour créer un tube pour diriger la mesure
 
  +
* Meeting at Isandlatech with Olivier Gattaz
* Travail sur les composants cohorte
 
  +
* Tests with a car around Isandlatech
== Semaine 11 : 21 Mars - 27 Mars ==
 
  +
* Creation of a tube to lead the sensor waves
== Semaine 12 : 28 Mars - 3 Avril ==
 
  +
* Working on Cohorte components
== Semaine 13 : 4 - 6 Avril ==
 
  +
Problems :
  +
* Impossible to get speed measures over than 25 km/h
  +
  +
== Week 11 : 21/03 - 27/03 ==
  +
Work done :
  +
* Discover of the need to build an amplification circuit
  +
* Working on the connection between the different Cohorte components
  +
* Working on the report
  +
Problems :
  +
* Problems with the integration of Cohorte components in the application
  +
  +
== Week 12 : 28/03 - 03/04 ==
  +
Work done :
  +
* Working on connecting between the different Cohorte components
  +
* Working on transmitting data from the sensor to the server
  +
* Working on the report
  +
* Working on “Échantillonneur” and “Élaborateur” components
  +
Problems :
  +
* Problems with the dependances between components
  +
  +
== Week 13 : 04/04 - 06/04 ==
  +
Work done :
  +
* Finalization of the application
  +
* Working on the Flyer
  +
* Working on the presentation
  +
* Finalization of the report

Latest revision as of 18:24, 5 April 2016

Project team

  • MACE Quentin
  • NOUGUIER Thibaut
  • RAMEL Régis
  • Tuteur : Olivier Gattaz

Project progress

Week 1 : 11/01 - 17/01

Work done :

  • Choice of the project
  • Presentation of Cohorte by Olivier Gattaz and Bassem Debbabi

Week 2 : 18/01 - 24/01

Work done :

  • Discover of the project environment
  • Installation of Cohorte tools
  • Definition of functional and non-functional requirements
  • Writing of the SRS

Week 3 : 25/01 - 31/01

Work done :

  • Cohorte tutorial done
  • Realisation of UML diagrams

Week 4 : 01/02 - 07/02

Work done :

  • Meeting at Isandlatech with Olivier Gattaz
  • Study of the Doppler effect
  • Simulations of speed calculations based on the frequency
  • Starting the project with Cohorte

Week 5 : 08/02 - 14/02

Work done :

  • Meeting at Isandlatech with Olivier Gattaz
  • Working on the component diagram
  • Working on the web client’s structure
  • Definition of processed data and synthetic data
  • Tasks repartition
  • Working on use case

Week 6 : 15/02 - 21/02

Work done :

  • Meeting at Isandlatech with Olivier Gattaz
  • Working on Cohorte : Specification of components an application’s structure
  • Working on wiring the sensor
  • Working on connecting the Raspberry Pi (many fails)

Problems :

  • Confusion between our Raspberry and Isandlatech’s
  • SD carte troubleshooting, impossible to install raspbian

Week 7 : 22/02 - 28/02

Work done :

  • Holidays
  • Tries to install raspbian on the Raspberry (fail)

Week 8 : 29/02 - 06/03

Work done :

  • Installation of raspbian on the Raspberry
  • Working on the 7th march presentation

Problems :

  • An Arduino is needed to acquire measures from the HB100

Week 9 : 07/03 - 13/03

Work done :

  • 7th march presentation
  • Working on the web interface
  • Meeting at Isandlatech with Olivier Gattaz
  • Working on the connection Raspberry – Arduino
  • Working on the connection Arduino – HB100
  • Connexion between Arduino and a PC established
  • Working on returning and displaying measures from the sensor

Week 10 : 14/03 - 20/03

Work done :

  • Working on the transmission of data between the Arduino and the Raspberry
  • Working on the data process
  • Working on the web interface
  • Working on the Raspberry components
  • Meeting at Isandlatech with Olivier Gattaz
  • Tests with a car around Isandlatech
  • Creation of a tube to lead the sensor waves
  • Working on Cohorte components

Problems :

  • Impossible to get speed measures over than 25 km/h

Week 11 : 21/03 - 27/03

Work done :

  • Discover of the need to build an amplification circuit
  • Working on the connection between the different Cohorte components
  • Working on the report

Problems :

  • Problems with the integration of Cohorte components in the application

Week 12 : 28/03 - 03/04

Work done :

  • Working on connecting between the different Cohorte components
  • Working on transmitting data from the sensor to the server
  • Working on the report
  • Working on “Échantillonneur” and “Élaborateur” components

Problems :

  • Problems with the dependances between components

Week 13 : 04/04 - 06/04

Work done :

  • Finalization of the application
  • Working on the Flyer
  • Working on the presentation
  • Finalization of the report