Difference between revisions of "Proj-2012-2013-BuildingManagementSystem"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | We are 3 RICM4 students from [[Polytech Grenoble]]: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from [ENSAG]: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs. |
+ | We are 3 RICM4 students from [[Polytech Grenoble]]: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from [[ENSAG]]: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs. |
==Objective== |
==Objective== |
||
− | The objective of this project is to design and prototype a subsystem of temperature control and air quality ([HVAC])of a building management system. |
+ | The objective of this project is to design and prototype a subsystem of temperature control and air quality ([[HVAC]])of a building management system. |
==Progress== |
==Progress== |
Revision as of 23:46, 21 January 2013
We are 3 RICM4 students from Polytech Grenoble: Mame Daba DIOUF, Michael COSTA DE CASTRO, Ruy Guilherme SILVA GOMES DE OLIVEIRA and one architect student from ENSAG: Francine OURIQUES, in partnership with Saint Gobain, Giga Concept and Intel Software Labs.
Objective
The objective of this project is to design and prototype a subsystem of temperature control and air quality (HVAC)of a building management system.
Progress
Week 1 : 2013/01/14 - 2013/01/20
- Choice of the subject.
- Group formation.
- Scientific monitoring.
Week 2 : 2013/01/21 - 2013/01/27
- Familiarization with Arduino
- Writing of the Software Requirements Specification (SRS)
(Write the SRS)