Difference between revisions of "RICM4 2017 2018 - robair2"
Jump to navigation
Jump to search
Jordan.Jean (talk | contribs) |
Jordan.Jean (talk | contribs) |
||
Line 1: | Line 1: | ||
+ | =='''Progress'''== |
||
⚫ | |||
+ | |||
− | Présentation et découverte du matériel et réflexion sur le cahier des charges. |
||
− | + | ==Semaine 1== |
|
+ | Presentation of the hardware and brainstorming. Establishment of the specification. |
||
− | Installation du logiciel et réglage des problèmes de version. |
||
⚫ | |||
+ | Installation of RobAIR software and fixing version issues. |
||
+ | ==Semaine 3== |
||
+ | Study of interface implemenation and addition of a button on the client interface. |
Revision as of 13:50, 12 February 2018
Progress
Semaine 1
Presentation of the hardware and brainstorming. Establishment of the specification.
Semaine 2
Installation of RobAIR software and fixing version issues.
Semaine 3
Study of interface implemenation and addition of a button on the client interface.