Difference between revisions of "RICM4 2017 2018 - robair2"

From air
Jump to navigation Jump to search
Line 1: Line 1:
=='''Progress'''==
+
'''Progress'''
   
 
==Semaine 1==
 
==Semaine 1==
Line 6: Line 6:
 
Installation of RobAIR software and fixing version issues.
 
Installation of RobAIR software and fixing version issues.
 
==Semaine 3==
 
==Semaine 3==
Study of interface implemenation and addition of a button on the client interface.
+
Study of interface implementation and addition of a button on the client interface.

Revision as of 13:51, 12 February 2018

Progress

Semaine 1

Presentation of the hardware and brainstorming. Establishment of the specification.

Semaine 2

Installation of RobAIR software and fixing version issues.

Semaine 3

Study of interface implementation and addition of a button on the client interface.