Difference between revisions of "RICM4 2017 2018 - robair2"

From air
Jump to navigation Jump to search
Line 1: Line 1:
 
=='''Progress'''==
 
=='''Progress'''==
   
==Semaine 1==
+
==Week 1==
 
Presentation of the hardware and brainstorming. Establishment of the specification.
 
Presentation of the hardware and brainstorming. Establishment of the specification.
==Semaine 2==
+
==Week 2==
 
Installation of RobAIR software and fixing version issues.
 
Installation of RobAIR software and fixing version issues.
==Semaine 3==
+
==Week 3==
 
Study of interface implementation and addition of a button on the client interface.
 
Study of interface implementation and addition of a button on the client interface.
  +
==Week 4==
  +
It is now possible to take picture.

Revision as of 17:56, 12 February 2018

Progress

Week 1

Presentation of the hardware and brainstorming. Establishment of the specification.

Week 2

Installation of RobAIR software and fixing version issues.

Week 3

Study of interface implementation and addition of a button on the client interface.

Week 4

It is now possible to take picture.