Proj-2013-2014-COQP: Difference between revisions
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
The project started January 13th, 2014. |
The project started January 13th, 2014. |
||
== Week |
== Week 0 (January 13th - Janurary 19th) == |
||
*Project discovery |
*Project discovery |
||
*Research on OpenHAB |
*Research on OpenHAB |
||
== Week 1 (January 20th - Janurary 26th) == |
|||
*Listing of material at our disposal |
|||
*Meeting with Pierre Dubois (CEO Requea ), presentation of the project |
|||
*First install of OpenHab on the Rasperry Pi |
|||
*First draft of possible final specifications |
Revision as of 10:51, 27 January 2014
Introduction
Projet de dispositif matériel et logiciel de détection de présence dans une salle ou d'utilisation d'une machine (en fablab par exemple). Connexion à des agendas, systèmes de réservation (Dysoweb Agenda), système de gestion de la HVAC ...
Documents
Team
- Tutors : Didier Donsez, Pierre Dubois
- Members : Flavien PEYRE , Clément VALENTIN
- Departement : RICM 4, Polytech Grenoble
Project objectives
Not decided yet (in progress...)
Progress of the project
The project started January 13th, 2014.
Week 0 (January 13th - Janurary 19th)
- Project discovery
- Research on OpenHAB
Week 1 (January 20th - Janurary 26th)
- Listing of material at our disposal
- Meeting with Pierre Dubois (CEO Requea ), presentation of the project
- First install of OpenHab on the Rasperry Pi
- First draft of possible final specifications