Proj-2013-2014-RobAIR-1: Difference between revisions

From air
Jump to navigation Jump to search
No edit summary
Line 44: Line 44:


== Week 4 (January 3th - February 9th) ==
== Week 4 (January 3th - February 9th) ==
* fixe Skype objectif with Mr Donsez
* fixe Skype objectif with M. Donsez
* we try to run the code from previous years (we can't understand how their project could work with so many mistakes...)
* we try to run the code from previous years (we can't understand how their project could work with so many mistakes...)
* Now robair can speak with keyboards press
* Now robair can speak with keyboards press
* Graphique interface is woorking but we can't control robair with this. (Debug in progress)
* Graphique interface is working but we can't control robair with this. (Debug in progress)




== Week 5 (January 10th - February 16th) ==
== Week 5 (January 10th - February 16th) ==
* Bug with control and webcam connexion (client try to connect himself but he can't be connected to the server)
in progress.......
* Rendez-vous with M. Donsez because we are so in late to realized this project : Finaly we modify us subject --> skype can't worked because code is closed so we are going to use "WebRTC".

== Week 5 (January 10th - February 16th) ==
* WebRTC is a new technology so we don't have any documentations : if you want to used webRTC follow this instructions : [http://www.webrtc.org/reference/getting-started/ http://www.webrtc.org/reference/getting-started/] (in progress)

Revision as of 14:03, 24 February 2014

Introduction

Project RobAIR

Team

  • Tutors : Didier Donsez,Amr Alyafi
  • Members : Augustin Husson, Jérôme Barbier

Project objectives

  • Faire transiter des messages de commandes d'un pc vers une tablette sur le robot pour le contrôler
  • Utiliser skype comme intermédiaire pour faire transiter ces messages
  • Faire une interface graphique permettant facilement de faire bouger le robot sans passer en ligne de commande
  • Faire en sorte que skype fonctionne en tâche de fond (donc sans son ihm ) afin de l'utiliser exclusivement comme support
  • traduire la page actuel

Related documents

How to prepare your project before starting coding like whale : here

Progress of the project

The project started January 14th, 2013.

Week 1 (January 13th - Janurary 19th)

  • Project discovery
  • Research of related projects

Week 2 (January 20th - Janurary 26th)

  • Mise au point des objectifs de l'équipe
  • Récupération d'un kit Rob-Air à monter
  • Initialisation de la phase d'assemblage de ce robot en partenariat avec l'équipe composée de David Levayer et de Paul Mariage
  • Recherche sur "comment faire un plugin skype"
  • Première tentative pour faire fonctionner skype via java : skype doit, pour le moment être lancé avec son interface graphique pour que le code java fonctionne.
  • Search how skype is used to

Week 3 (January 27th - February 2nd)

  • Assembly of two new RobAIRs --> just one for the moment
  • Beginning of the redaction of Software Requirements Specification
  • ROS environment installed on Ubuntu and work
  • RobAIR can now move by itself ! (debug in progress)
  • Meeting with Amr Alyafi (effective code obtained)

Week 4 (January 3th - February 9th)

  • fixe Skype objectif with M. Donsez
  • we try to run the code from previous years (we can't understand how their project could work with so many mistakes...)
  • Now robair can speak with keyboards press
  • Graphique interface is working but we can't control robair with this. (Debug in progress)


Week 5 (January 10th - February 16th)

  • Bug with control and webcam connexion (client try to connect himself but he can't be connected to the server)
  • Rendez-vous with M. Donsez because we are so in late to realized this project : Finaly we modify us subject --> skype can't worked because code is closed so we are going to use "WebRTC".

Week 5 (January 10th - February 16th)