RICM4 2017 2018 - Ruche Connectee: Difference between revisions

From air
Jump to navigation Jump to search
Line 28: Line 28:
== Week 2 (22 January - 28 January) ==
== Week 2 (22 January - 28 January) ==


* Installation de l'environnement Mbed-Cli pour pouvoir développer et compile sur nos machines (Faire un tuto ?)
* Instalation of Mbed-Cli used to compile offline on our own device (Perhaps make a tuto ?)
* Adaptation with the STM32
* Prise en mains des cartes
* Premier échange en deux cartes grâce au script "Hello World" trouvé en ligne (https://os.mbed.com/teams/Semtech/code/SX1272PingPong/)
* First interraction of to STM32 using LoRa, thanks to the "Hello World" script found online : https://os.mbed.com/teams/Semtech/code/SX1272PingPong/
* Découverte d'outils tel que Grafana, Node-red et InfluxDB (http://air.imag.fr/index.php/Developing_IoT_Mashups_with_Docker,_MQTT,_Node-RED,_InfluxDB,_Grafana)
* Discovering tools such as Grafana, Node-red et InfluxDB (http://air.imag.fr/index.php/Developing_IoT_Mashups_with_Docker,_MQTT,_Node-RED,_InfluxDB,_Grafana)


== Week 3 (29 January - 4 Febuary) ==
== Week 3 (29 January - 4 Febuary) ==

Revision as of 10:23, 12 February 2018

Project presentation

Schéma général du projet
Division des tâches entre les deux groupes

Ruche connectée LoRa : Implementation and access to several sensors on a hive on a building roof to retrieve data remotely using LoRa technology. The goal is not to have physically next to the hive. (Advantages: Not open the hive in winter, don't go on site, ease of analysis, not disturb the bees ...).


Sensors placed in the hive :

  • Weight
  • Temeprature
  • Pressure
  • Humidity

This allow the beekeeper to go on the site only once the honey is retrievalbe and manage the health of the swarm.

Team

BESNIER Bejamin, LEVESQUE Théo et WEILL William

Supervisor : Mr PALIX Nicolas

Progress et status

Week 1 (15 January - 21 January)

  • Choice and discovery of the project.
  • Briefing on what we will have to do and the objectives to reach.
  • Distribution of the material (STM32 and LoRa sensor).

Week 2 (22 January - 28 January)

Week 3 (29 January - 4 Febuary)