Proj-2013-2014-COQP: Difference between revisions

From air
Jump to navigation Jump to search
Line 23: Line 23:
The project started January 13th, 2014.
The project started January 13th, 2014.


== Week 1 (January 13th - Janurary 19th) ==
== Week 0 (January 13th - Janurary 19th) ==
*Project discovery
*Project discovery
*Research on OpenHAB
*Research on OpenHAB

== Week 1 (January 20th - Janurary 26th) ==
*Listing of material at our disposal
*Meeting with Pierre Dubois (CEO Requea ), presentation of the project
*First install of OpenHab on the Rasperry Pi
*First draft of possible final specifications

Revision as of 10:51, 27 January 2014

Introduction

Projet de dispositif matériel et logiciel de détection de présence dans une salle ou d'utilisation d'une machine (en fablab par exemple). Connexion à des agendas, systèmes de réservation (Dysoweb Agenda), système de gestion de la HVAC ...

Documents

Team

  • Tutors : Didier Donsez, Pierre Dubois
  • Members : Flavien PEYRE , Clément VALENTIN

Project objectives

Not decided yet (in progress...)


Progress of the project

The project started January 13th, 2014.

Week 0 (January 13th - Janurary 19th)

  • Project discovery
  • Research on OpenHAB

Week 1 (January 20th - Janurary 26th)

  • Listing of material at our disposal
  • Meeting with Pierre Dubois (CEO Requea ), presentation of the project
  • First install of OpenHab on the Rasperry Pi
  • First draft of possible final specifications