Difference between revisions of "ASAC/SJC/CR4"
Jump to navigation
Jump to search
Justin.Ruaux (talk | contribs) |
Justin.Ruaux (talk | contribs) |
||
Line 4: | Line 4: | ||
===Progress during holidays=== |
===Progress during holidays=== |
||
− | Théo and Nicolas tried the cards,the sensors and |
+ | Théo and Nicolas tried the cards,the sensors and the LoRa plug-in thanks to the basic programs and the previous project programs. |
+ | They also started the main program witch mesure the temperature and send it via the LoRa plug-in. |
||
− | === |
+ | ===Work session content=== |
+ | *Creation of a previsional schedule |
||
− | *Décision de créer un diagramme de Gantt (tableau prévisionnel) |
||
− | === |
+ | ===Visitation of the farm=== |
Revision as of 17:52, 16 November 2017
<< Previous week report | Back to project | Next week report >>
Work session 4 : report - 09/11/2017
Progress during holidays
Théo and Nicolas tried the cards,the sensors and the LoRa plug-in thanks to the basic programs and the previous project programs. They also started the main program witch mesure the temperature and send it via the LoRa plug-in.
Work session content
- Creation of a previsional schedule