ASAC/GEJC/CR3

From air
Revision as of 20:32, 29 November 2017 by Yann.rossetto (talk | contribs) (Created page with "=Instrumentation of the water pocket= *Following of the brainstorming about the ToF sensors : instead of putting them on a stand, we could put them under the sides of the pock...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Instrumentation of the water pocket

  • Following of the brainstorming about the ToF sensors : instead of putting them on a stand, we could put them under the sides of the pocket, facing the ground. We could use more sensors (up to 4), in order to improve the reliability of the measurement.
  • Searches about the I2C protocol, used to communicate with the ToFs
  • Brainstorming about the control of the pumps, with new informations provided by Mr Hibon
  • Some thoughts about the use of the X-NUCLEO-IKS01A1's accelerometer to get additionnal data when the the water pocket is being filled