Difference between revisions of "Proj-2015-2016-Extensions IPOPO"
Jump to navigation
Jump to search
Remi.Gattaz (talk | contribs) |
Remi.Gattaz (talk | contribs) |
||
Line 24: | Line 24: | ||
=== Problems faced === |
=== Problems faced === |
||
− | |||
− | |||
Line 36: | Line 34: | ||
=== Work done === |
=== Work done === |
||
+ | * Studied the code of iPOPO |
||
+ | * Prepared meeting with Thomas CALMANT |
||
+ | === Problems faced === |
||
+ | |||
+ | |||
+ | == Week 3 (Janvier 25th - January 31th) == |
||
+ | |||
+ | === Objectives === |
||
+ | * Work on the design of our extension |
||
+ | * Creation of UML Diagrams |
||
+ | |||
+ | === Work done === |
||
+ | * UML Diagrams: |
||
+ | ** [[Proj-2015-2016-Extensions_IPOPO/UseCase | '''Use Cases''']] |
||
+ | ** [[Proj-2015-2016-Extensions_IPOPO/Sequence | '''Sequence Diagram''']] |
||
=== Problems faced === |
=== Problems faced === |
Revision as of 17:30, 25 January 2016
Subject: Services étendus pour le modèle de composants iPOPO pour Python (in French)
Supervisors:
- Thomas CALMANT
- Didier DONSEZ
Students:
- Abdelaziz FOUNAS (RICM4)
- Rémi GATTAZ (RICM4)
- Marwan HALLAL (RICM4)
Subject summary
Week 1 (Janvier 11th - January 17th)
Objectives
- Meet with supervisors
- Decide which suggested extension of IPOPO we will work on
- Understand the subject
Work done
Problems faced
Week 2 (Janvier 18th - January 24th)
Objectives
- Create the project's SRS
- Lean python
- Learn how to use IPOPO (basic usage)
Work done
- Studied the code of iPOPO
- Prepared meeting with Thomas CALMANT
Problems faced
Week 3 (Janvier 25th - January 31th)
Objectives
- Work on the design of our extension
- Creation of UML Diagrams
Work done
- UML Diagrams: