* Implementation of the global docker with all the tools used (Graphana, InfluxDB, Graphana)
 
* Implementation of the global docker with all the tools used (Graphana, InfluxDB, Graphana)
   
== Week (5 Febuary - 11 Febuary) ==
+
== Week 4 (5 Febuary - 11 Febuary) ==
 
* Installation of the LoRa gateway with the Lora-net GitHub repository (https://github.com/Lora-net/lora_gateway)
 
* Installation of the LoRa gateway with the Lora-net GitHub repository (https://github.com/Lora-net/lora_gateway)
 
* Begin the SRS of the project (https://air.imag.fr/index.php/RICM4_2017_2018_-_Ruche_Connectee_/_SRS)
 
* Begin the SRS of the project (https://air.imag.fr/index.php/RICM4_2017_2018_-_Ruche_Connectee_/_SRS)
   
== Week (12 Febuary - 19 Febuary) ==
+
== Week 5 (12 Febuary - 18 Febuary) ==
 
* Do the UML of the project (https://air.imag.fr/index.php/RICM4_2017_2018_-_Ruche_Connectee/UML)
 
* Do the UML of the project (https://air.imag.fr/index.php/RICM4_2017_2018_-_Ruche_Connectee/UML)
  +
  +
== Week 6 (19 Febuary - 25 Febuary) ==
  +
* Educational interruption
  +
  +
== Week 7 (26 Febuary - 4 March) ==

Revision as of 15:29, 27 February 2018

Project presentation

Schéma général du projet
Division des tâches entre les deux groupes

Ruche connectée LoRa : Implementation and access to several sensors on a hive on a building roof to retrieve data remotely using LoRa technology. The goal is not to have physically next to the hive. (Advantages: Not open the hive in winter, don't go on site, ease of analysis, not disturb the bees ...).


Sensors placed in the hive :

  • Weight
  • Temeprature
  • Pressure
  • Humidity

This allow the beekeeper to go on the site only once the honey is retrievalbe and manage the health of the swarm.

Team

BESNIER Bejamin, LEVESQUE Théo et WEILL William

Supervisor : Mr PALIX Nicolas

Progress et status

Week 1 (15 January - 21 January)

  • Choice and discovery of the project.
  • Briefing on what we will have to do and the objectives to reach.
  • Distribution of the material (STM32 and LoRa sensor).

Week 2 (22 January - 28 January)

Week 3 (29 January - 4 Febuary)

  • Implementation of the global docker with all the tools used (Graphana, InfluxDB, Graphana)

Week 4 (5 Febuary - 11 Febuary)

Week 5 (12 Febuary - 18 Febuary)

Week 6 (19 Febuary - 25 Febuary)

  • Educational interruption

Week 7 (26 Febuary - 4 March)