RobAIR2013-RICM4-Groupe1-Suivi: Difference between revisions

From air
Jump to navigation Jump to search
Line 56: Line 56:
==WEEK 5: from February 11th to February 17th==
==WEEK 5: from February 11th to February 17th==
* Comparison tests between the latency when disabling an interface with TCP and MPTCP.
* Comparison tests between the latency when disabling an interface with TCP and MPTCP.
* We updated our [[SRS_RobAir_RICM_Group| SRS]] ato its final version.
* We updated our [[SRS_RobAir_RICM_Group| SRS]] to its final version.


==WEEK 6: from February 18th to February 24th==
==WEEK 6: from February 18th to February 24th==

Revision as of 13:02, 18 February 2013

the Team

This team is composed of two 4th year Polytech Grenoble students, in System & Networks specialty.

The members of this team are Alexandre Corso and Laurène Guelorget.

Project objectives

Our project is a part of the RobAIR2013 project.

The shared project

RobAIR is a shared project with two others schools:

  • ENSIMAG
  • Superior Pole Design of Villefontaine

The project consists of the development of a telepresence robot used for museum tours. It is a low cost robot (well below the maket price). The platform and software used for this robot are extensible and open-source.

Our sub project objectives

We are responsible for the roaming between the robot and the landscape:

  • Roaming ensures that the wireless device is kept connected to the network, without losing the connection.
  • For that, we decided to use the Multipath TCP Protocol because it offers better throughput and a smoother reaction to failures.

Technologies used

  • Multipath TCP Protocol

Material

Progress of the project

The project started January 14th, 2013.

WEEK 1: from January 14th to January 20th

  • We discovered the project and the different objectives.

WEEK 2: from January 21st to January 27th

  • We organized a meeting with the 3I4 and RICM4 students. During this meeting, we talked about what everyone understood of this project and what everyone's objectives are.
  • We met with the three students from Pole Design de Villefontaine and they told us what they have been working on for the last month.
  • Meeting with Rémi Barraquand at INRIA to talk about ROS.

WEEK 3: from January 28th to February 3rd

  • Writing of the SRS (first draft)
  • Talk with Thomas Calmant and Joao Claudio Américo who worked on RobAIR before with Didier Donsez

WEEK 4: from January 4th to February 10th

  • Meeting with the RICM5 working on this project
  • Talk about the different options to use to implement the roaming. We decided to use the Multipath TCP protocol and we started to study this protocol.

WEEK 5: from February 11th to February 17th

  • Comparison tests between the latency when disabling an interface with TCP and MPTCP.
  • We updated our SRS to its final version.

WEEK 6: from February 18th to February 24th

  • ...